إعلان ،،،
أبنائي الطلاب
إذا لم يتوفر لديكم جهاز ذكي أو انترنت،
يمكنكم حضور دروسكم من خلال قنوات عين التعليمية
على التردد الجديد بعد التحديث :
عرب سات
التردد 12437
استقطاب عمودي
27500 معدل الترميز
DVB-S2
نتمنى التوفيق للجميع
الثلاثاء، 6 مايو 2025
MG 1.3 Unit 11 Writing P. 175 Homework
MG 1.3 Unit 11 Writing P. 174 - 175
Dear friend,
I’m sorry to hear that you’re devastated about losing your
friend over $25. I understand that you loaned him the money from the allowance
you had saved over several months. But as you said, you don’t mind helping a
friend if you can.
I understand it’s upsetting to be misunderstood by someone
close to you, but as the saying goes, a friend in need is a friend indeed.
Friendship often requires sacrifices if you want it to last.
That said, I’m afraid I agree with your friend — you
shouldn’t have embarrassed him in public. If I were you, I would call and
apologize to him. I’m sure he’ll understand that you didn’t do it on purpose.
I hope things work out for you.
Your Name
الثلاثاء، 29 أبريل 2025
الأحد، 27 أبريل 2025
الاثنين، 21 أبريل 2025
الأحد، 20 أبريل 2025
الخميس، 17 أبريل 2025
MG 1.3 Unit 10 FMF P. 162
Ex. A P. 162
Ex. A P. 162
1. heat, boils
2. climb, will need
3. see, might be
4. get, will see
5. mix, end up/will end up